Ticket #4332 (new task)

Opened 4 months ago

Last modified 3 months ago

Full Board Test

Reported by: goskab Assigned to:
Priority: major Milestone: Interface.1
Component: Testing Version: Interface.1
Keywords: Cc:

Description

The following parts must be tested before Interface.1 can be considered done

  • Electrical Test
  • Cypress/USB Test
  • Mega Test
  • CC2431 Test
  • Accelerometer Test
  • All Buttons Tested
  • Touchpad tested
  • Touchscreen tested

The full board test will run through all of the components and quickly check that they work on 10 boards.

Change History

07/31/09 10:50:59 changed by goskab

  • summary changed from Full Board Test Interface to Full Board Test.

08/24/09 08:35:58 changed by goskab

  • owner deleted.
  • component changed from General Hardware to Testing.